Preliminary buildability screening

Is Your Georgia Property Buildable?

A property can look perfect and still contain development constraints that dramatically change what can be built.

The screening process

Six checks, one clear write-up.

Buildability is not a property attribute — it is the relationship between a property and a specific project. The screen evaluates both together.

  • Parcel research

    We start with the parcel record: dimensions, acreage, jurisdiction, and the district the property sits in.

  • Zoning review

    We check whether your intended use appears permitted and what dimensional standards would apply.

  • Utility availability

    We research whether water and sewer appear available, or whether septic and well would be required.

  • Access review

    We look at frontage, likely driveway location, and whether access appears workable for the proposed use.

  • Floodplain screening

    We screen publicly available flood mapping to see whether mapped hazard areas affect usable land.

  • Constraint summary

    We write up what looks supportive, what needs more research, and what requires a licensed professional.

Common blockers

What usually stops a project.

  • No legal or practical access to a public road
  • Zoning that does not permit the intended use
  • No sewer service and soils that may not support the required septic system
  • Mapped floodplain covering most of the usable area
  • Steep grade that makes the intended footprint impractical
  • Easements crossing the only realistic building area
  • Parking demand that exceeds what the site can hold

Development Constraint Matrix

Sample — illustrative only

Example development constraint matrix showing categories and preliminary status
CategoryPreliminary status
ZoningAppears supportive
UtilitiesFurther research
AccessAppears supportive
FloodplainAppears supportive
TopographyFurther research
StormwaterRequires professional evaluation
EnvironmentalAdditional investigation recommended
ParkingAppears supportive

Every property is different. This matrix is illustrative only and does not represent findings for any specific parcel.

Find out for $495.

Submit the property and your intended use. You will have preliminary findings in 2–3 business days.